Bellaria
Bellaria 3
Schermata 2022-11-21 alle 15.20.10

GROUNDING

Parco del Sole, Rimini. The redevelopment of this area represents an action to use a former landfill in Bellaria in the province of Rimini.

The plant, built in 2012 by ECA Technology has a capacity of 4.912 MWp.

The large platform underneath the structure is made of reflective concrete to improve the performance of the plant.

Dedicated PRODUCTS.

Renewable Energy

Learn more >

Industrial Air Conditioning

Learn more >

Car Charging Stations

Learn more >

Led Lighting

Learn more >

SIMILAR REFERENCES

× Come possiamo aiutarti ?